电商详情
当前位置: 首页> 电商详情

产品详情

Surface discharge 5G/H quartz tube ozone accessories

Surface discharge 5G/H quartz tube ozone accessories
  • 产品介绍

Product structure specification

-------------------------------------------------------------------------------

1. The accessories of ozone generator for quartz tube surface discharge consist of two parts, one is ozone tube for surface discharge and the other is an ozone high-voltage and high-frequency power supply.

2. Composition and characteristics of surface discharge quartz tube: the inner electrode adheres tightly to the inner wall of quartz tube, the outer electrode 304 stainless steel mesh firmly stabilizes on the outer wall of quartz tube, and the quartz tube is made of silica quartz sand with dielectric material content of over 99.7%. The main characteristics of quartz tube are high dielectric constant maturity, good dielectric toughness and not bad during transportation. The thermal expansion coefficient is low, and the normal service life is greater than 8000 hours.


Instructions for equipment use

-------------------------------------------------------------------------------

Quartz tube surface discharge ozone generator fittings are mainly used for air sterilization and purification. One or more sets of equipment can be installed. It is the main core component of air treatment ozone machine. The gas source can be rich in oxygen or air. This generator is suitable for harsh environment, such as humid environment. The dust in the air can be used and the dust on the surface of the ozone tube can be cleaned regularly.


Equipment installation instructions

-------------------------------------------------------------------------------

Step 1: High voltage power supply and ozone tube are installed on the insulating board, which is fixed in the cabinet. Attention should be paid to the installation of ozone tube and high voltage power supply. The distance between ozone tube and high voltage power supply and metal cabinet shell is more than 3 cm (if the high voltage part is too close to the metal cabinet shell, it may form high voltage eddy current, which may affect the use or even damage), and ozone tube installation. Located in the convective air space on the chassis, it ensures that the fan on the working machine can blow to the surface wire mesh of the ozone tube, and ensures that the external electrode of the ozone tube is air-cooled and stable. The greater the wind force, the better the stability of the product.

The second step: If there is more dust in the environment space, we need to do some dust-proof treatment in the air inlet to avoid too much dust adhering to the discharge surface, affecting the discharge effect.

Part 3: Inspection circuit: High voltage lines on three ozone tubes are connected in parallel to two high voltage lines of high voltage power supply. When installing, cut the high-voltage wire as short as possible according to the location of the installation, so as to avoid the high-voltage wire touching other lines or objects in the chassis. If conditions permit, the high-voltage wire can be sleeved on the silica gel tube with an inner diameter of 8 mm, so as to make it safer. Other circuits, especially the connection lines of digital display electronic devices, should not be close to the high-voltage part (high-voltage package, high-voltage wire, ozone tube), otherwise the high-voltage may interfere with its normal use function.


The connection between ozone tube and high voltage power supply is illustrated.



1542613025023035151.png

In the figure, red and blue are high voltage lines. After parallel connection of the electrodes corresponding to the ozone tube, they are connected to the high voltage power supply line, regardless of the positive and negative electrodes.

Installation tips: the discharge part of each ozone tube must be blown by wind. The greater the wind power, the more stable the product is. Try to make every ozone tube blow to the wind, and the air volume is basically the same.


Points for attention

-------------------------------------------------------------------------------

1. After receiving the goods, please check whether the equipment is damaged or missing spare parts to ensure that there are no problems before putting them into installation and use.

2. During installation of components, please pay attention to handle them gently and avoid breaking down.

3. After installing the equipment, please check whether there is any problem between the gas circuit and the circuit, and make sure that the power is restarted after no error.

4, equipment installation to ensure high pressure without leakage to the chassis shell, high pressure danger.

5, prohibit the use in inflammable and explosive places.


上一页
下一页