电商详情
当前位置: 首页> 电商详情

产品详情

5G/H ozone machine

5G/H ozone machine
  • 产品介绍

technical parameter

-----------------------------------------------------------------------------

Name: 5G/H ozone machine

Model: YJ-5GA or YJ-5GB (two types of chassis)

Working voltage: AC220V/50HZ.

Power consumption: less than 120W

Air supply: dry clean oxygen or air.

Ozone production: 5G/H

Working environment temperature: -10 ~ 45 C

Working environment humidity: less than 85%

Outline size: 36*22.5*29.5CM

Gross weight / net weight: 8.8/8.0KG


product mix

-------------------------------------------------------------------------------

1, the product shell adopts 1.2MM spray box, beautiful appearance, durable and humanized design.

2, three digit control panel, set working hours and cycle mode freely.

3. Manual adjustment of mechanical potentiometer, 5%~100% ozone production can be adjusted, according to demand, ozone output concentration and output can be adjusted freely.

4, oxygen / air switch, use oxygen or air as needed.

5, the power line is designed by socket.

6, the internal high voltage 3600V, non professionals do not open the box.

7. Internal ozone generator is specially designed for European and American export standards. There is no high pressure outside when working, so it has superior safety.

8. High-power DC fan, the wind direction is specially designed for the wind guide trough, which has better heat dissipation performance. The temperature rise of ozone generator is not higher than 5 degrees of ambient temperature when it works.

9, mute air compressor pump, small vibration, low noise.


Instructions for equipment use

-------------------------------------------------------------------------------

YJ-5G ozone machine is a humanized ideal equipment for water treatment and air treatment sterilization and purification. It is widely used in city air purification, removing pesticides from fruits and vegetables, operating rooms, aseptic workshop, food processing industry, storage room, fungus culture room, aquaculture farm, laundry room, hotel, central air-conditioning and so on. .


Equipment installation instructions

-------------------------------------------------------------------------------

The first step is to place the equipment in a dry, clean, well ventilated environment where the temperature is not greater than 45 degrees.

The second step: connect the ozone outlet with the trachea and place the trachea in the place where it needs to be processed.

Step 3: If the air source used is air, the two air outlets of "air output" and "air/oxygen input" need to be connected with rubber hose (which are already connected when leaving the factory), and the start switch key is pressed to the AIR position; if the air source used is oxygen, the rubber hose on the "air/oxygen input" air port needs to be removed. Next, connect the oxygen pipe to the air/oxygen input port, and press the start switch key to the OXYGENGAS position.

Part 4: Put the power cord in, turn on the power supply and turn on the power switch. At this time, the working state display screen shows the working state.

The fifth step: set the working mode (digital control):

A: press the setting button and the circulation indicator flickers.

B: press time plus or minus the time required to work (maximum 600 minutes, minimum 1 minutes). Press the time setting key again to set the time needed to stop (maximum 600 minutes, minimum 1 minute), and press the time setting key again to save the data (infinite cycle). If no cycle is required, the number is set to 0.

C: press the start / stop button to start working. In the working state, press the start / stop button to stop the work and press again to continue working. This machine has memory function, and will resume the last working data after reboot.

D: when the working time is stopped, the alarm sounds three, and the numbers flicker.

 

1542436933710055952.png

O

XYGEN GAS position is fan start, OFF position is power off, AIR position is fan and air output start at the same time.

The start/stop key is to suspend or start the work. When the work begins, ozone output will occur, while no ozone output will occur when the work is suspended.


 

1542436933810015673.png


Points for attention

-------------------------------------------------------------------------------

1. After sealing, check whether the random accessories are complete and the equipment is in good condition according to the packing list.

2, do not collision during moving, so as not to damage.

3. If the equipment does not need to be installed for the time being, please do not remove the plastic film on the machine and store it in a cool and dry place.

4. The equipment is installed in a well-ventilated and clean environment, where the installation position can not be watered by rainwater and the ambient humidity is greater than 90%.

5, prohibit the use in inflammable and explosive places.

6. It is forbidden to block the ventilator of the machine. Otherwise, the temperature of the machine will rise and the ozone concentration will decrease, and the service life will be shortened.

7. Ozone outlet ozone concentration is high, the human body should not be exposed to ozone for a long time. Ozone thrown into the airtight space can be decomposed naturally after the machine stops working for 60 minutes before human can enter.

8. Non-professionals should not open the chassis. General electricians should consult professional maintenance personnel before opening the chassis.


Daily maintenance of equipment

-------------------------------------------------------------------------------

1. The equipment should be placed in a dry, ventilated and clean environment, with ambient temperature ranging from - 10 to 40 degrees Celsius and relative humidity less than 85%.

2, when the equipment is maintained, the power line must be disconnected.

3. Check ventilation exhaust on equipment regularly. If there is more dust, remove it and clean it up in time and put it back in place.

4, the equipment can work continuously for 24 hours for a long time, but please ensure that the equipment is well ventilated and heat dissipated.

5, the wet towel used for cleaning the chassis must be twisted dry and used. Do not splash the water into the machine.

  


上一页
下一页